The Bank Job – Update
[featured-img] Progress of the Bank Job construction.
In this video, we can see the transformations and the progress of the first and second floor. The division of the rooms and the isolated floating floor installation on the second floor
The Bank Job – Construction Starts
You can take a look to some pictures of the transformation realized to the property below:
The following two tabs change content below.
Latest posts by Craig Lambie (see all)
- Credit Score is so important - October 24, 2020
- The Bank Job – Live Project Update - July 1, 2020
- The Bank Job – Tour - May 27, 2020